Located in the East Midlands, Mountsorrel Quarry supplies the construction industry with large volumes of essential materials, which are used for construction projects throughout the UK. Due to an industrial fire which left a screen house beyond repair, a complete rebuild was required which included the design, supply and installation of safe, compliant access solutions.

 

Requirement

Wright Engineering Group required four floors of open mesh flooring, handrail, stanchions and treads to re-build an industrial building at Mountsorrel Quarry that burnt down in November 2022, for the site to be back to full working capacity.

Solution

Lionweld Kennedy Group designed, manufactured and installed four floors of steel and GRP access solutions to the Mountsorrel site, enabling the building to be rebuilt safely. LK 20mm ball proof Safegrid flooring was required due to the height of the building and permanent access needed under each floor.

 

Lionweld Kennedy Group were by far the standout choice of all of the suppliers we contacted. From the beginning the service was second-to-none, all items arrived on their project critical specified delivery dates, and the quality of the products were of a very high standard. Lionweld Kennedy Group remain a preferred supplier within the Wright Engineering Group due to the high quality of products and the excellent customer service always received.

Luke Fagan, Construction Manager, Wright Engineering Group

Sign up to our newsletter

*Mandatory Fields