Design, supply and installation of a 20 Tonne platform to the Top of the Shaft for United Utilities to gain access to the ongoing maintenance of the Spray Heads that are used to clean the screens below.
Supply and installation of the pipework system to the Spray Heads and lifting the whole structure in to place with a 500 Tonne Crane.